• 2016-10

    Admitted into the Top Runner Program by CQC.

  • 2016-10

    Launched high-end module ”High Power”, water surface power station only

  • 2016-04

    Launched 5 busbar multicrystalline high power module; 5 busbar-spilt high power module.

  • 2016-02

    Took the lead in finishing diamond wire cutting reform.